POTENTIAL SURVEY OF THE WARIORI RIVER ( SP 9 ) MASNI DISTRICT AS A SMALL SCALE ELECTRICITY POWER PLANT (PLTMh) IN MANOKWARI REGENCY, WEST PAPUA PROVINCE

SURVEY POTENSI SUNGAI WARIORI ( SP 9 ) DISTRIK MASNI SEBAGAI PEMBANGKIT TENAGA LISTRIK SKALA KECIL ( PLTMh ) DIKABUPATEN MANOKWARI PROPINSI PAPUA BARAT

Authors

  • Bibiana Rosalina Wihyawari

Keywords:

Debit,, Head, MHPP

Abstract

This study is dealing with Warioryriver masni Development calculation of the water flow and power potential of water as a Power Plant Micro Hydropower ( MHPP ).Potention survey wariory river calculating water flow, power potential an four sample.Calulating water flow and power potention as reached wariory river as 152 kW . Calculating water survey river wariory water flow and power potention. Output calculating river warioryis very power potential fora Power Plant Micro Hydropower ( MHPP ).

Published

2023-01-22

How to Cite

Wihyawari, B. R. . (2023). POTENTIAL SURVEY OF THE WARIORI RIVER ( SP 9 ) MASNI DISTRICT AS A SMALL SCALE ELECTRICITY POWER PLANT (PLTMh) IN MANOKWARI REGENCY, WEST PAPUA PROVINCE: SURVEY POTENSI SUNGAI WARIORI ( SP 9 ) DISTRIK MASNI SEBAGAI PEMBANGKIT TENAGA LISTRIK SKALA KECIL ( PLTMh ) DIKABUPATEN MANOKWARI PROPINSI PAPUA BARAT. JISTECH: Journal of Information Science and Technology, 6(2). Retrieved from https://jurnal.unipa.ac.id/index.php/istech/article/view/142